Energy Management

Energy Management

  ·How To Begin

  ·Case Study

  ·The Ever Increasing   Power Bill

Solar & Renewable Technology

renewable energy widget

  ·Solar Energy

  ·Solyndra System

  ·Projects

  ·See Real Time
  Solar Production

Data Centers/Critical Power

critical power   ·Improve Efficiency

  ·Always On

  ·Reduce Cost

  ·Solutions

Email Newsletter icon, E-mail Newsletter icon, Email List icon, E-mail List icon Sign up for our Email Newsletter

Generac Industrial Generator Options

MODULAR POWER SYSTEMS (MPS)

generac_logoFor larger applications that require superior system reliability and redundancy, engineers typically turn to complex and expensive parallel systems. With Generac’s Modular Power System (MPS), a parallel system is now available at prices comparable to, or less than, a large single genset. Generac has integrated all of the control functions traditionally performed by numerous controllers from several manufacturers into their exclusive PowerManager® control system. The result is a system with the benefits of parallel generation in a simple, single-source system. Built-in redundancy, scalability, low cost, easy installation and short delivery times make Generac’s Modular Power System the smart choice for multi-megawatt standby power solutions.

  • Superior reliability from redundancy of a multiple genset configuration
  • Easy and cost-effective installation
  • Proven digital paralleling made simple
  • Serviceability without critical system interruption
  • Scalable and flexible power modules
  • Fastest lead times in the industry

Gemini®genrac_multi_gensets

When space is at a premium and reliability is critical, no other manufacturer even comes close to Generac’s Gemini Twin Pack. By using a smaller, high volume industrial engine, Gemini gensets can normally be delivered weeks, or even months faster than a large single engine unit.  In addition, Genrac engines can be serviced by a qualified engine technician using commonly available parts. You can purchase the system you need today, and as your standby power requirements increase, additional units can be installed quickly and easily. A s part of Generac’s MPS system, up to seven Gemini gensets can be paralleled without additional switchgear, for a total output of up to 7000 kW.

  • Twin Gensets packaged in one compact 1000 kW unit
  • Single, electrical termination point offers easier connection
  • Inherent critical load redundancy within one common • Quiet, sound-attenuated operation

Bi-Fuel™

Generac’s Bi-Fuel generators start on diesel fuel and add natural gas as load is applied. During an outage, they typically operate on a mixture of up to 90% natural gas and 10% diesel fuel. If the natural gas supply is interrupted, the generator automatically switches to 100% diesel without any power drop during the transition.

  • Simultaneous use of diesel and natural gas
  • Redundant on-site fuel source
  • Reliable and responsive diesel engine platform
  • Available in Generac’s Modular Power System
  • Reduced fuel storage with increased run times
  • Factory built, supported and warranted
  • Reduced cost per kilowatt vs. larger natural gas units

Contact Chuck Clarke to learn more about generator options for your needs. Call 404.681.3270 or email to cclarke@empoweret.com.

Leave a Reply

HOT Topics
Corporate Headquarters

154 Krog Street
Suite 140
Atlanta, GA 30307
404.681.3270 – Office
404.592.0171 – Fax
info@EmpowerET.com

Get Directions
More Contact Info


Asheville, NC Office
828.333.8714
edward@empoweret.com

Social